These are images of a drive way project we recently completed in Bembridge.
After clearing the area of over grown plants, and breaking and clearing the old broken concrete drive we excavated deeply to create a permeable drainage system.
Granite setts were laid as edgers to contain the shingle, and to prevent migration onto the highway. To stabilise the shingle we installed a plastic grid, thus preventing rutting.